Down in the Basement Studio

I have finished a bunch of siding and am ahead of the carpenter guys so I started in on painting the concrete walls in my basement studio.  It is hard!!  I probably should have a sprayer but I am rolling it on (two coats of primer) and the surface which I thought was kind of smooth is nothing but!  It is like trying to paint the surface of the moon with all its craters and pock marks.  Still, I persist and I am finally getting some sort of painted finish even if it isn't perfect.  It certainly brightens up the space.  Today the electricians will install the LED lighting and that will be great!  No dark corners.







And this will be the bathroom.  The plumbers had a heck of time dealing with the trap in the tub.  I don't think it was prepped correctly when the slab was poured but what do I know?  The layout was also not done right (we were not consulted) so the toilet will have to be turned and a little half wall built so that we have room to get to the tub.  This is ridiculous because we had all the room in the world down there.  It will all work out.

Comments

Popular posts from this blog

Just Getting Started

Front Entry

On the Line